The project was an upgrade program for the Ashbridges Bay Treatment Plant P Building Headwork and Odour Control system. The project consisted of removal and modification of the existing equipment and structures, extensive electrical work, instrumentation and control systems, SCADA integration, heating and ventilation work, disposal of removed unwanted equipment, piping, and disposal of excavated and/or contaminated materials.